Disaster preventionOS Div. responsible building system backup for critical systems such as Active Directory servers, Files servers, GL Server). Backup system is the main system 20 km and over according to the straight line.The system envisaged alternative style was the main system within 4 hours from when the main system that has the problem not khăc.A minimum of 3 months, conducting tests, reviews the operation of the backup system. A minimum of 6 month, conducted rehearsals convert critical it systems from the main system to a backup system, according to the script to check, evaluate the operation of the backup system. For the Core Banking System, require providers to report audit report which includes the BCP/DRP to ensure the system work when disaster.