Cause:
- The contractor responsible for the lack of inspection in accordance with progress in construction techniques.
- The number of employees working for the garbage transfer not guaranteed.
Technical requirements of the project:
- Strengthening the Family reinforcing iron bars fixed in position associated vach- floor.
- the position weld reinforcement steel bars to handle joints, anti-rust paint before closing panels
- consultant checked before construction of the next.
- Strengthening supervision for the construction work of contractors
- rating labels for electric tube as required by the PMU.
- Treo fighting back the tube to ensure technical
Conclusion:
+ Do not connect the tube PVC electrical power for the building's gutters.
+ the contractor completed and reinforced steel bars reinforcing the walls, repainted the welding position
+ Transfer the garbage out of the school construction
compact + Towards the electrical cables, pipes the building's existing electrical.
+ Reinforcement, hanging back fighting positions down the first pipe sprinkler
instructions:
+ contractors fix the errors before 16h on 12/11/2016