1. The company has made the water quality monitoring and reporting as prescribed in the permit has been granted. However, the sampling and analysis of unknown samples have meet the requirements stipulated in the decree 127/2014/ND-CP.2. The company has not yet made the monitoring of waste flow parameters for the air environment in the area of operation of the plant according to the EIA report content has been approved. Need to explain in writing the changes to the content of the implementation of phase 2 and 3 of the project. In the operating phase of testing waste water treatment system, the value of parameters in sewage samples Coliform after being processed in the wastewater treatment system is not yet stable, have many times crossed the QCVN regulation 40:2011/BTNMT, column A of the regulations. However, since the waste water treatment system operation stable, results assessment Coliform has reached.3. Companies not sampled, analyzed to delineate charcoal arising from waste water treatment system. Sewage sludge from wastewater treatment systems have not yet been sampled delineation by the service units have the capacity to have appropriate management measures.4. Unknown CTNH shipping agent of the company has been authorized QLCTNH practice owners sign the contract or not. The case is not authorized, the company signed a contract with the dealer.5. CTNH store not yet fully meet the requirements as prescribed (not waterproof floors).6. the inspection Group will continue to collect relevant records; After reviewing the records, documents collected by the company provides, the inspection Group will continue to evaluate, identify new violations (if any) and apply the measures disposed according to the regulations of the law on the protection of the environment and water resources.
đang được dịch, vui lòng đợi..
