The number of pipes, poured concrete (tremie pipes) for a piece of the wall (panels) must ensure the distance from tube to edge away for no more than 1.0 m, while ensuring speed surges of concrete not less than 3 m/hour. The tube submerged deep in the concrete at least 2 m. If the expected delay in the provision of the concrete should use slow-curing additives.
đang được dịch, vui lòng đợi..