Step 1: saturation of water-Before construction of the scanning products should we water saturated to avoid wall surface water leads to bad eating and waterproofing materials will not seep behind to create linksStep 2: waterproofing-Depending on each type of product we should execute 2 or 3 layers to ensure the sealed surface coating waterproofing needs.-Construction of the waterproofing layer angles vertically from top to bottom, after class after class before the scanned surface dry (about 2-24 h, depending on the outdoor temperature as well as customized product type used).-The average thickness of each layer is 1 mm. The dosage used for each class is 1-1, 5 kg-Should divide the amount into several smaller containers to mix materials for many construction applications at the same time.Step 3: the need for attention-With the original product should cement need good maintenance requirements to ensure the material is the most security and made a good adhesive to the surface need waterproof as well as create the dense membrane.-Should not mix in too much material at the same time to avoid the execution not up
đang được dịch, vui lòng đợi..