Just remove the formwork when the concrete has enough time specified and must be approved by the engineer. The concrete will be made completely wet as soon as formwork has been eased and is kept wet during the formwork removal until the apply maintenance measures for concrete surface
đang được dịch, vui lòng đợi..
