Follow technical instructions covering contractors conducting reference paragraph ERS.
All work of reference covering sections are specified in section 3.3.2 The reference cover - Soft Soil Treatment.
- The monitoring equipment installed on the reference sections before laying out the entire scope of the project.
- In addition to the broken meter track subsidence and high stakes and lines needed to monitor the entire embankment on the section, the electronic Piezometer must be installed below the ERS, at the location and depth are shown in the drawings, or as directed by the Engineer. The electronic Piezometer will be used to monitor pore pressure generated during loading, and the dissipation of pore pressure during the subsidence of ERS.
Technical Regulations for this Piezometer put in this section of the Technical Regulations.
- Prepare proposals subsidence monitoring.
- As a result of subsidence monitoring proposals, conducting monitoring equipment installed for the whole project