-Based on meeting the conclusive announcement about threading traffic serving the construction Tunnel chui bridge Railings-project development urban traffic of Hai Phong city of 384/TB-SGTVT on 22/05/2015 of the Department of transport in Hai Phong-Based on construction license No. 184/GPTC GENERAL POSTS-TRANSPORT level on 22/05/2015 of Hai Phong CITY traffic Department for Tunnel construction in CW3A package Fence bridge climb: tunnel construction the bridge Railings and path segments chui Km13 + 450-Km16 + 100-project development urban traffic of Hai Phong city-Text based number 1438/SGTVT-HTGT 30/07/2015 on the construction of CW3A package: crawl Tunnel construction the bridge Railings and path (Km13 + 450-Km16 + 100), the category of Tunnel construction the bridge Railings to underground;-According to the actual situation of the project area.Under the direction of the Department of transportation to Hai Phong Pmu and the area of TRANSPORTATION works on guaranteed traffic serving the construction of tunnel construction category and path bridge chui (CW3A package) development projects in urban traffic, the contractor has to improve traffic-Threading approach to submitting You approved agency. Under Threading approach on, due to the actual situation in the region has changed, the Department of TRANSPORTATION has banned Memorial Bridge for traffic to Luang Prabang and transfer the bridge Railings 2, also due to the request of the Department of transportation to Haiphong is when the bridge Railings 2 triggered traffic jams then the media loaded in the car through the bridge Railings are 13T ≤ 1. The contractor has temporary bridge design to automobile traffic and load-resistant < 13 tons (different from the text of 384/TB-SGTVT only for motorcycles through the bridge Railings 1). However, to ensure that the machinery, working under the temporary bridge during the construction process, suggested the Department of TRANSPORTATION have written official notification about the types of cars are stored through the temporary bridge and the maximum load of the vehicle, in order to limit the vehicle runs too load allows flow through the temporary bridge.Contractors are looking forward to your review, You see your approval authority on traffic flow on segment, as the basis for implementing the work bidders on field, meet the progress of the project. The contractor is committed to ensure the current rules about traffic safety, not to traffic jam occurs in the process of construction.
đang được dịch, vui lòng đợi..
