Party B will start construction as early as November 15, 2016 or when party A handover of premises eligible construction (premises were hygiene and perfection, the ceiling and walls completed) point to options front and side B receive deposits, drawings and samples of the material was approved by party A. The total construction schedule for CT1 and building buildings mixed with time is 90 days.Party B got handed A party ground floor works by or under each apartment but a minimum of the number of apartments is apartment 13/console.If the request from A party that the increased workload, the schedule will be adjusted to match reality. The adjustment will be party A notice in writing and is the base to implement the terms of the contract.