Operating HTXLNT commitment. directly operate the wastewater treatment systems, sewage sludge. employees operate at least 3 persons/day. Side B must ensure waste water quality standard output, the permission of industrial waste discharge. When there are any problems that affect the quality of water output, on the contractor to fix right away and when the problem is too capable of handling contractors-party then the party must request the contractor the investor support to ensure the quality of water output. When waste water quality substandard output led to the penalty, the owner needs to clearly identify the causes leading to the output water quality does not meet. If the output does not meet water quality due to the fault of the contractor, the contractor party cause will pay penalty according to the level of fine that brought industrial zone. If the cause leading to the water quality of the output is not guaranteed due to the fault of the owner side include the following error: no support for chemical storage, chemical enhancement to HTXLNT forklift, no water for chemical, brewing process does not support power for the operation of the contractor, the owner must take responsibility for the quality of water output.
đang được dịch, vui lòng đợi..
