1. On the main pipe hanging fixtures are installed here only temporarily, because we need to adjust the height, and about the actual construction process, after finishing our assembly will be fixed and the suspension tubes the main forces in the truss factory.
2. Locusts tube.
- They
're real adjustment after assembly at the location because during installation will have to be adjusted error, we want to put together exactly with the actual size of the machine in factory. this can not be done on the drawing is accurate so we do not give the welded pipe fixed. the fixed die welding will be done as accurately assembled into the system, the balance of the tubes are not clean and smooth, we will handle it when complete.
- About tube positioned locusts FINGER JOINT plant, Mimosa and Mr. Fields to adjust and seek guidance from him, instead of locusts tube should be perpendicular to the main pipe D500, now have to go in parallel with the main pipe because of your D500 place the tube in the machine too close to the centerline axis of the tube, he please consider the attached drawings and tell us from his comments.
3. On the exhaust fan with the filter Bags eccentric compared to the size of the fan due to the larger size of the installation position so that when installed 100mm up working platform workshops were hitting a wall so we need to adjust position the fan to not crash into the wall. Currently we have 2 solutions for this.
A. Option 1 We will make pipes out of the filter bags 1 angle deviated by 12 degrees with respect to the center axis of the system and connected to the exhaust fan.
B. Option 2 we will expand the mouth of Bags filter to coincide with the center of the mouth of the mouth to the fan center is located on the same line.
Please let us know the comments from him to the system is complete more.