Based on the letter No. DLM-BRE17-00011-15-E, after 17 bridge Enterprise Exchange with subcontracting units Freyssinet cable-stayed bridge in category construction beyond the belt 2. Freyssinet subcontractors given the schedule, duration and scale of the trip is as follows: -The expected ingredients: 3 people.-Estimated time: departure scheduled trips in the period July 30, 2015 to 30/10/2015.-Location: Europe (France, Germany, Belgium).-Total trip time is 8 days.(Details see the attached text)17 bridge factory-Cienco1 please submit to the main contractor Daelim review and planning with the deployment.So looking forward to getting the cooperation and help of gentlemen!
đang được dịch, vui lòng đợi..