Construction of a rolling basis and divided into several segments each segment is 40 m long and 60 m apart. Construction of continuous and contiguous knee, when a work item of the first paragraph will be transferred step completion of construction, construction equipment has just completed work will be moved to the next segment, construction follow steps repeated.
splitting the construction methods outside Cat Hai Island (works) and onshore (beach Dinh Vu) for finishing works as follows: