a) works must be constructed according to the design drawings (including amendment be approved by owner), the technical guidelines are outlined in the bid suit normative systems, standards are applied to the project and the regulations on the quality of construction works of the State concerned;b) Side B must give A party the results of experiments of the input materials, the product of the work completed. The results of this test must be carried out by the laboratories have standard according to regulation. In the event of the meeting the results of experiments suspected party A has the right to request party B repeated to confronting.c) Side B ensure supplies and equipment provided by party B has the origin, quality certification, auditing certification such as the provisions of the contract records
đang được dịch, vui lòng đợi..