Construction Conditions:
Only conducted paint dry weather, no fog, air humidity <85%, depending on the temperature allow paints.
Not allowed to paint when rain is imminent, rain or rain when just finished, no construction in places with drafty ...
* Preparation before painting:
The workload paint must be calculated accordingly, can not be left unfinished paint job until the next day or lengthen the time it gets dark light.
Must stir well, coating before use. For two-component paint or older, should mix all the volume of each component according ratio manufacturer's instructions. The mix paints required to perform by agitators.