By reporting the number 73/TCT-QLDA1 on December 06, 2014 Corporation no. 1-LIMITED (CC1) on 20 June 2014 leadership HUNGTHINH CCI were present to attend the meeting to launch the project Son petrochemical refinery with the project Steering Committee, 2nd Executive Committee-CC1 at the Office the CC1-Nghi son petrochemical refinery.
construction Corporation no. 1 (CC1) is the unit of subcontracting was the JGCS general contractor signed the contract in progress construction and the work piles in Zone 1 and Zone 2 of the project the Nghi son oil refinery (Thanh Hoa). The main workload includes BTCT Piles (390,000 m), concrete (150,000 m3), (11,300 tonnes), formwork (345,000 m2) will be constructed mainly from March to October 2014/2015.
through overview reports of the Board of the same content presented with canards CC1 Corporation and the opinion of the contractor, HUNGTHINH CCI has been building Corporation LTD., no. 1 (CC1) appreciated and chosen as one of the leading subcontracting units participated in the construction of the project. During the session, handing United the CC1 HUNGTHINH CCI construction area Zone 2/KV3 A600 with a total area of 3.2 hectares for construction, temporary value estimated to reach 35 billion, depending on the time, According to the actual situation and progress HUNGTHINH CCI will be handed items in other areas on the premises.
đang được dịch, vui lòng đợi..