Currently, please support me on issues related to the volume of the contract are as follows:According to TC No.1 page 6/10 then this is outside the scope the scope of the MEP but SVO and JRP consultants suggest MEP on the Habitat volume minus 6.3 items; 6.4 11.1 and due in the BOQ ELV systems with content:
đang được dịch, vui lòng đợi..
