Hệ thống giao thông, thoát nước mưa, thoát nước bẩn, cây xanh, chiếu sáng Đường Số 3 (Đoạn từ khu tôn giáo đến đường số 8) đã được xây dựng hoàn thiện, khối lượng chi tiết như sau:
The transportation system, drainage, drainage dirty water, green trees, lighting the road number 3 (Paragraph from the religion to the road number 8) has been built complete, detailed volume as follows:
Transportation system, stormwater, wastewater drainage, trees, lighting Street 3 (Clips from the religious to road number 8) was built complete, detailed volumes as follows: