Drainage to the roof above the cellar door peach background taluy is combined with mechanical water level trench, rain water will be collected and led about horizontal drain at Km1 + 800
Drainage for the upper slope peach background groove engine hatch is combined with water level and rain water will be collected and advice on the horizontal drain at Km1 + 800