Mr Kim,
after a meeting with Mr Dong (Vietstar supplied electrical cabinets for items STP) we agreed as follows:
1. Currently, power conditioning is not operating running under process technologies, some cabinets have no connection signal buoys to protect water submersible pump
2. AnhThuytech proposal Vietstar finishing and installation of some remaining equipment was lost to operate.
3. AnhThuytech will provide process runs automatically sync the entire wastewater treatment system, responsible Vietstar signal wiring control cabinets PLC (Programming Logic Control) provided by AnhThuytech.
4. AnhThuytech provide additional control cabinet components for chemical clusters and mixed signal connections on the central control cabinet.
Today we (AnhThuytech) composite panel will send him to fix all the remaining defect to operate STP, he reviewed and closing time for the parties combined implementation