2.2. design planning2.2.1 suggested the comments that Party B for the necessary and consistent with the project that is not yet A Party put on A party request records.2.2.2 research project content and scale, survey, design planning 1/500 ideas for Side a. every product design concept master plan includes the design, presentation design establishment estimated the cost of construction, 3D movies have duration 1 minute and other related records. 2.2.3 completed and issued the record drawing the design ideas of planning regulations and reporting requirements of party A and the departments.2.2.4 attended the meeting report and design suggestions improve the efficiency of the design and save costs at the request of A Party for the purpose of saving construction cost, the cost and time of operation without changing the target and reduce the quality of the project. 2.2.5 provides a full list of personnel and subcontractors (if any) involved the implementation process for A Party for approval.2.2.6 full participation and election personnel have the competencies, responsibility to solve the problem in meetings related to design or when A Party Committee meeting convened during the design process and the report design ideas. If Party B is absent, must have a good reason and a 24-hour notification required with representatives of A Party. If absence too 3 times without notice, party A has the right to unilaterally terminate the contract.2.2.7 guarantee true progress has United with A Party
đang được dịch, vui lòng đợi..