2.Ve the internal controls of the service he paid to:
our products are of the device certificate and he can check from the list of equipment was signed between me and the official representative of room HSE appointed by his work with us. If he doubts he can then compare with other parts. We are people who can not travel outside each department to collate be. I attached to this letter as confirmation tally between me and his job Academy - was the celebration of his work with us.
3. By the way, I would say more: Recently, when performing verification in SMV, Division of his HSE and other relevant departments to do the testing almost no coordination and causing us a lot obstacles, lose time and affect the safety and quality of work performed. Even, we are people from outside in which to try to manually download cable hook, crane control to load test while operating machinery underneath just because no support due to lack of unified collaboration Mr.
few reviews so that he was better
đang được dịch, vui lòng đợi..