About power: the goal all the sugar mills will power cogeneration plant investment up to the national grid, with a total capacity of thermoelectricity bagasse reach about 122.6 MW by 2020. In it, will upgrade the power dissipated by the company factory TTCS 37 MW, built up new thermal power plants at the Water Line in the company with a capacity of 8 MW
đang được dịch, vui lòng đợi..