The cheat the mass pillaging the topsoil layer in white as well as in the entire path of package A3 on 300,000 m3, JTEG own. A3 (Jiangsu company) paid to 30/6/2016 topsoil layer peeling 150,000 m3, the wantonly Hill km 103:53,000 m3 so payment control on 200,000 m3 of ground raids, but the waste at the dump allows no then that volume where that payment?
đang được dịch, vui lòng đợi..