After we receive your feedback. We have investigated the production process in each stage of the production Slim ballast Pana Drying temperature and drying time, the workers in the painting done right under the rules the paint, all the stages are performed according to the procedures and rules that the company put out. We have conducted ballast lighting test with the number is in which Slim 4pcs Pana 3pcs 1pcs, time Lekise and lit 3 days starting at 19 h 00 on 23/01/2016 to 19 h 00 on 26/01/2016. Detailed results see attachment. Over the process of lighting tests, the nature of similarities between ballast and slim lekise pana the same color change, the quality of the paint after the test were similar in the same. After lighting the side you have to ask how many days lit levees check paint fading to us to improve.
đang được dịch, vui lòng đợi..