-Machined and drilled 21 measuring mold in basement 1 of the construction (floor 20 cm), the position of mold observations in detail drawings from BV-02.
- Processing and drilling 21 markers measured in the basement of the building 1 (20 cm from the floor), the location of the landmark observation shown in detail in the drawings from the BV-02.