Based on the minutes of working on 02/04/2013 on the unification construction of Foundation pit soil and digging pits refund loan borrowed land.To ensure the progress of the project, pending investor established the procedure for the approval authority to the payment to the contractor before ordering changes as required by the contract. The contractor was very trying to execute and complete the schedule, was supervising experience. Based on the volume of sand pump the refund has been supervising trials in the process of construction. The contractor suggested pumping sand mass payments returned the pit dug to borrow the land as follows:1. application processing phase I (Indoor and Outdoor): volume has construction and testing. Sand leveled in Binzhou, pumped from the river Late on waste water treatment plants is 4.12 km divided into three levels with a pump located 1 mile = > pump level, unit cost calculation for 1m3 sand pump located 4.12 km = price per unit 1m3 pump sand located 1 km = > multiply 3 times apply according to State's policy regime (norms price, ca air under decision No. 3701/PPC-XDCB on November 30, 2010) at the time of construction, the time of approval of undertakings arising sand pump. Trong trường hợp này Nhà thầu sẽ chào giá cho 1m3 cát bơm, đơn giá này sẽ được các bên thương thảo và phải được Giám đốc dự án chấp thuận trước khi thanh toán cho Nhà thầu theo qui định của hợp đồng.2. Hồ giai đoạn II: Cát san lấp tại Tân Châu, cự ly bơm từ Sông Hậu vào Nhà máy xử lý nước thải là 4,12 km, đơn giá tính cho 1m3 cát bơm cự ly 4,12 km áp dụng theo các văn bản, chế độ chính sách của Nhà nước mới được ban hành của tỉnh An Giang (Bộ đơn giá theo quyết định số 1172/QĐ-UBND ngày 27/04/2016 ).Trong trường hợp này Nhà thầu sẽ chào giá cho 1m3 cát bơm, đơn giá này sẽ được các bên thương thảo và phải được Giám đốc dự án chấp thuận trước khi thanh toán cho Nhà thầu theo qui định của hợp đồng.
đang được dịch, vui lòng đợi..