5. conditions of construction paint5.1 contractor paint.Contractor use of paint at the request of the design and the technical instructions of the manufacturer of paint for each steel works.Need the layout has the expertise on the paint to monitor the quality of the paint for the project from the beginning to the end.When receiving the paint should receive the synchronization type of the paint (the paint against rust, paint ...), accompanying of solvent paints and other additives (if available).5.2. the background surfaceEach painting has a protection system requires proper surface preparation, the preparation depends on the initial conditions. The corresponding requirements should be specified in the technical requirements and must be able to achieve that.The method of surface preparation are described in 4.2. The surface has to be evaluated on cleanliness, when seen by eye, clean level of chemistry and surface deformation, use the method has to in 4.3.The requirements for the monitoring the stages of construction of the paint, the frequency of reviews and the location of the job reviews must be agreed between the parties concerned.If other surface conditions on the condition described in the techniques required to notify customers.Unless otherwise specified, the surface temperature must be in the dew point of the environment.5.3. preparation of construction paintBefore the construction of the paint to the steel surface quality inspection was clean and supervising the newly agreed works.Execute the best painting by paint spray gun, under the pressure of compressed air, gas pressure for a top gun about 303.98 kPa.When executing the paint should comply with the following conditions:+ Spraying areas with no dirt, airy and completely isolated the source of the fire.+ Steel surfaces have been cleaned as required;+ Weather dry, the outdoor temperature should not be too 35oC, humidity not exceeding 85%.+ Do not paint when the weather is rainy or going out but the air is still wet.+ Do not paint when there is strong wind.+ Spraying equipment should reach specifications about cleanliness of compressed air and gas pressures.+ Paint construction workers need to be trained on paint and paint the steel bridge construction process.The construction of the new steel bridge construction or maintaining repainted must implement the terms of the provisions of the construction process.After finishing all the paint, paint corrosion need experience full of technical norms specified in ISO 8789:2011 (adhesion, the thickness of the layer of paint on the surface of steel), then move on to the paint coating.For new steel beams, steel bridge built this page is produced in the factory, then the need to fully paint paint paint and corrosion from 1-2 layers of paint, the paint to ensure corrosion for steel during construction of the steel girder Assembly.When the steel bridge constructions were finished, paint the mounting pitches 1-2 final coatings. Before the final layer of paint defects need enough layers of paint were milling, cleaning surfaces from dirt and water vapor, it is best to wipe the last phase to create a paint solvent by adhesion between the layers of old paint and new paint.CAPTION 6:(a) for new construction that prolonged construction period, steel beams were painted on a new year Assembly, you will need to fully paint paint by design. After you have finished Assembly still must paint adds a final layer.(b) The pipeline, or accessories placed under the steel must complete paint ROAR before pouring the concrete surface.6. Paint construction6.1. The methods of construction paint6.1.1. scanning methodThis method is specific to the corners, the head bolts and the corners, hard to reach areas to execute by using other methods. Medium-viscosity paints are.6.1.2. the rolling methodThe high viscosity paints and must have good new flattened properties consistent with this approach. The type and size of the rollers must match the size of the steel beams. Generally should not use the roll method for corrosion-resistant primer.6.1.3. MethodThe following injection method in common use:Conventional spray in the air condition low pressure;Spray in the air without conditions;Spray in the air condition is weak;Electrostatic spraying;The viscosity of paint, spray nozzle type, pressure, temperature of the coating materials; the distance from the top of the nozzle to the surface needed paint and spray angle must be selected so that you can create are coating is continuously and evenly.When using this method to pay attention to avoid spray dust flying around.If necessary paint membrane thickness can not be achieved at the edges, corners or hard to reach areas of texture is to execute, then the Department must be broom sweeps prior paint, use a type of striped coatings or by spraying.Because the paints tend to be deposited should be the container of paint should be stirred the mix before use.6.1.4. Other methodsIf using other methods for instance melting paint or corrosion, the tape must be done according to manufacturer's instructions.6.2. construction coating process6.2.1. process of construction paint solvent and paint6.2.1.1. The construction of the system of solvent and water system may be done by different methods: scanning method, the method of roller, spray method.6.2.1.2. the layout Should have expertise on the paint to monitor the quality of the paint for the project from the beginning to the end.6.2.1.3. When receiving the paint should receive the synchronization type of paint (primer, paint ...), accompanying of solvent and other additives (if available).Tất cả các vật liệu sơn trên đều ở trạng thái bao bì nguyên bản, có đủ ký mã hiệu hàng hóa, nhà sản xuất, ngày tháng xuất xưởng và kèm theo các phiếu kiểm tra đạt yêu cầu kỹ thuật quy định tại TCVN 8789:2011, cũng như hướng dẫn của nhà sản xuất sơn.6.2.1.4. Các trường hợp được phép dùng chổi quét sơn:+ Mặt thép bị rỗ, nhiều điểm lồi lõm khác nhau;+ Các vị trí có mối hàn, các góc cạnh của dầm thép;+ Các vùng nối ghép của nhiều bản thép…;+ Khi thi công các loại sơn hệ một cấu tử có độ nhớt vừa phải (như sơn dầu), hoặc các loại sơn hệ hai cấu tử (như sơn epoxy).Những vị trí như trên phải dùng chổi quét sơn, quét và miết mạnh tay ngay từ lớp sơn chống gỉ đầu tiên lên mặt thép sao cho sơn được lấp kín các khe hở, sau đó mới tiến hành sơn theo thứ tự từng lớp một.6.2.1.5. Thi công sơn bằng con lăn chỉ sử dụng ở bề mặt bằng phẳng khi đã tiến hành sơn lớp sơn lót trước khi cần sơn thêm nhiều lớp để đạt độ dày cần thiết. Tuyệt đối không thi công sơn bằng con lăn ở những vị trí góc cạnh, những vị trí có tán đinh bulông.6.2.1.6. Phương pháp phun:a. Cần có biện pháp che chắn thích hợp để tránh phun bụi sơn rộng quá ra xung quanh.b. Độ nhớt của sơn, áp suất phun, loại vòi phun, nhiệt độ của sơn, khoảng cách đến bề mặt cần phủ, góc phun và tốc độ dịch chuyển vòi phun được lựa chọn để đạt được lớp phủ đồng nhất và liên tục, phù hợp với hướng dẫn của nhà sản xuất sơn.c. Phương pháp phun dọc ngang: đầu tiên phun dọc một lần, sau đó lại phun ngang một lần (hoặc ngược lại) làm cho màng sơn bằng phẳng, đẹp.d. Phương pháp phun dọc song song: dòng phun lần sau nằm lên một nửa dòng phun lần trước, phun một lần bằng hai lần, nâng cao hiệu suất lao động (thường dùng cho bề mặt lớn).e. Trước khi thi công, cần phun thử lên tấm thử nhỏ, kiểm tra trạng thái hạt sơn và độ bằng phẳng của màng sơn. Nếu có khuyết tật, cần điều chỉnh áp suất và độ nhớt sơn. Sau khi kiểm tra đạt yêu cầu, mới bắt đầu phun chính thức.f. Trước khi phun mỗi lớp sơn, toàn bộ các lỗ rỗ trên bề mặt phải được quét kỹ bằng chổi để điền đầy sơn vào những vị trí này.g. Mỗi lớp phun không nên quá dày vì khi bề mặt khô nhưng bên trong chưa khô, hơi nước, dung môi còn lại làm giãn màng sơn, tạo nên các lỗ châm kim.6.2.1.7. Khi thi công sơn cần tuân thủ các điều kiện thi công tại Điều 5.6.2.2. Quy trình thi công sơn không chứa dung môi hữu cơ6.2.2.1. Việc thi công sơn hệ sơn không dung môi có thể thực hiện bằng các phương pháp khác nhau: phương pháp quét, phương pháp lăn, phương pháp phun.6.2.2.2. Phương pháp quét: phương pháp này thích hợp sơn các bề mặt nhỏ, các góc cạnh, các vị trí khó sơn. Nhúng chổi vào sơn không ngập quá một phần hai độ dài phần chổi sơn. Trước tiên, dùng chổi miết mạnh ngay từ lớp sơn lót đầu tiên sao cho sơn lấp kín các khe hở, lỗ nhỏ, sau đó mới tiến hành sơn theo thứ tự từng lớp một một cách đều đặn, quét phần khó trước, phần dễ sau.6.2.2.3. Phương pháp lăn: phương pháp lăn phù hợp với việc sơn các bề mặt lớn, phẳng. Phương pháp này không nên áp dụng cho các bề mặt gồ ghề, các cạnh, góc và không áp dụng khi sơn lớp sơn lót đầu tiên.6.2.2.4. Phương pháp phun:a) Cần có biện pháp che chắn thích hợp để tránh phun bụi sơn rộng quá ra xung quanh.b) Độ nhớt của sơn, áp suất phun, loại vòi phun, nhiệt độ của sơn, khoảng cách đến bề mặt cần phủ, góc phun và tốc độ dịch chuyển vòi phun được lựa chọn để đạt được lớp phủ đồng nhất và liên tục, phù hợp với hướng dẫn của nhà sản xuất sơn.c
đang được dịch, vui lòng đợi..
