After handing over the premises constructed by the minutes handed the premises on 08/08/2014 of the Board, the contractor has conducted a demarcation border clearance, and against the approved design profile and noticed the range using the delivered raw footer missing roof taluy trackbed. On 13/12/2014 bidders had written the number 019/MANAGEMENT-CW3A/4A reported to regional Management Committee of TRANSPORT about the missing GPMB range mentioned above.To date, some contractors have been handing over the premises and construction in progress on excavating and up the road. However, due to the range of premises should the female part is missing construction taluy still could not execute and the contractor had to stop waiting for the process from the Original Quarter. In addition, in the area of tunnel to Underground Railroad bridge construction ground does lack the foot of wall space and serves construction measures (closing old Larsen, frame counter, formwork, etc.). So, since the time the contractor to stop construction because of the lack of premises, the contractor will be Disclaimer about slow progress under the terms of the contract.Because the new contractors currently receive only some of the premises should not have enough data to compare the width and breadth of the entire GPMB cross-section according to the pile. However, the contractor has full statistics on the pile width of packages CW3A and CW4A according to design documents of the Committee on statistics, compared with the figures of the average map GPMB.To ensure sufficient basis for contractors to resume construction at the scene, glass suggested You review and soon have matching process, ensuring the full scope of the ground construction for contractors.
đang được dịch, vui lòng đợi..