Article 5: Packing and sign
a) Goods as described in Appendix 1 will be closed in the appropriate timber sailing event and export standards. Before packing, all pieces of equipment and spare parts must be made of metal shell carefully, thoroughly coated with oil durable, waterproof to protect customers fully, corrosion or damages.
b) On both sides of each package, record the following markings in ink does not fade the country.
- The shipper:
- Number of contracts:
- Number of letters of credit:
- Event number: A / B ( A: The number of the event - B: total number of packages delivered on board).
- Weight: total / NET.
- Parts number: according to specifications prescribed in Appendix 01.
- Port to:
- The consignee:
- Dimensions: Length x Width x Height (cm).
c) On each event, at those locations necessary to note the fragile symbol, standing in this direction, to a dry place and so on. . (the international symbol instructions on handling / transportation, towing hook / crane / lift / storage necessary)
đang được dịch, vui lòng đợi..