- Upon receipt of the project layout, Electric group will go to the survey, planned to arrange electrical systems serving the building.
- The electrical panels are arranged CB overcurrent shutdown automatically.
- The conductor is kind of soft wire coated with 2 layers of insulation and the original wire rope is not connected.
- When you drag horizontally if construction goes underground to Conduit pipes buried at a minimum depth of 0.5m. The overhead wires must be at a minimum height of 2m to ensure safety.