Include measures covering works before dismantling (enclosed drawings TD.01 & TD.02) .Ben B conducted demolition roof section, the body to complete the 1st floor cos background of old works, hook foundations and demolition waste shipped out of the building.
- Party B is allowed to use the entire material of demolition works are as follows:
+ System purlins Roof tiles and iron and wood of all kinds,
+ System traditional doors and old windows,
+ Steel in Concrete ,.