Therefore, the repair investment to upgrade the irrigation system have welcomed Transfer and rural roads essential for practical production and people's life in the region. With the implementation of the project, will address the issue of restoring the capacity of irrigation system design have welcomed An offer sufficient irrigation water for current cultivation area was 2,204 ha, of which: consisted of 1,290 ha of rice, 884 ha of coffee and 30 hectares of flower color. The channel after the upgrade will help farmers in the project areas initiative in obtaining water, save time, save water and reduce production costs at the same time can extend the cultivation area.
đang được dịch, vui lòng đợi..