Article 62. Troubleshooting
1. In the process of handling the incident, Unit operated power system and electricity market operator licensed electrical systems with different frequency and voltage with the prescribed standards and implement measures to restore the system Power of normal operating state.
2. Measures troubleshooting
a) Stop the generating units to restore the frequency of the frequency range for normal operation;
b) Dismissal load on each relay lines by automatically fired or laid low frequency load discharged by the order dispatching;
c) Firing automatic load with low-frequency relays, placed at the appropriate point in the system. The operating power system and electricity market rules installation position, the adjusted value of the low-frequency relays and fired command load in case of system crashes. In the emergency operating mode, unit power system operation and power market has the right to dismiss the load at any frequency, in accordance with process troubleshooting;
đang được dịch, vui lòng đợi..
