The mixing is controlled according to the procedure guide the mixing/compounding work instruction, issued on 13th December 19, 2015-The support materials for the manufacturing process include: the above instructions-The main parameters are controlled in the stage include: time brewed caps-The export Frequency check the parameters be specified: 1 batch/times, the results are recorded in the form, the Mixing tank realeasing recordCheck out the profile of production: on: 20/04/2016, MT5: pre-incubation time: 21.5 hours (standard 19 ~ 40 hours)
đang được dịch, vui lòng đợi..