Because the width is 1.5 m dike face, To have the media down the road for construction, the contractor undertook construction of embankment extension out 3.5 m temporarily to make way for cars to transport the material down. The location, the size, height, length of the temporary contractors in construction measures drawing.
đang được dịch, vui lòng đợi..