Article 17. Check, confirm the environmental protection work serving the operation phase of the project1. The inspection of environmental protection works in service operating period of the project was carried through by the test group heads approved the report on environmental impact assessment or agency authorized to establish.2. The time limit for granting confirmation of completion of the work on environmental protection stipulates as follows:a) not to exceed fifteen (15) working days from the date of the report records the results of the environmental protection work serving the operating period of the project in the case do not require sampling, analysis of environmental indicators to verify;b) not to exceed thirty (30) working days of receiving the report records the results of the environmental protection work serving the operating period of the project in the case of sampling, analysis of environmental indicators to verify.
đang được dịch, vui lòng đợi..