Operational management solutions
operating solution works
from December 20 to the end of December: Open the drain irrigation upstream in tidal waves to get running water, open sewers combined final target system to wash salt deacidification in the coastal districts. Actively freshwater reserves in the system of aquaculture ponds end May 12.
From January 1 next year to advance the discharge phase 1 of the upstream pool:
Open the drain upstream water volume in the system. During this period based on the actual conditions of each locality, flexible water regulation reasonably ensure sufficient water for operating the pump station and not affect the winter crop acreage not harvested.
đang được dịch, vui lòng đợi..