Wind measuring head DOIT borrowed TWPC along with equipment for the work of data collection to measure wind in Coastal districts, The Township to serve the project wind power investment Korea Tra Vinh (stage 1) within a period of one year (from 1/4 until the end of March 2015//2016)
đang được dịch, vui lòng đợi..