Article 5: content and workloadThe Contractor made the construction works according to design drawings (including amendment be approved by owner), technical guidelines to be approved by the owner, the standard rules, standards, regulations of the State quality assurance, schedule, pricing, safety and other agreements in the contract.Job content includes but is not limited to:a) Established the quality management system in accordance with requirements, the nature and the scale of construction works. Which regulates the responsibility of the individual parts of the construction works in the quality management of construction works;b) perform the experiment of materials, components, materials, equipment, work equipment, before construction and installation on construction works according to design requirements;c) Established measures for execution, the work progress;d) and log construction works according to the rules;e) test and implement safety measures, security, fire prevention, environmental hygiene inside and outside the school.f) internal testing;g) reported TVGS, the owner of the progress, quality, volume, labor safety and sanitation construction according to the requirements of the investor;h) preparing the document as a base test according to the current rules and/or at the request of the owner and request TVGS, the owner held trials;I) scope of work described in the items a, b, c, d, e, f, g, h, but does not exclude the responsibility of the contractor according to the current rules of the State;j) supplies, materials (accompanied by quality certificates, certificate of origin, the origin of the manufacturer) and the construction as content, specific workload are detailed in the Appendix.
đang được dịch, vui lòng đợi..