c) power supply solutions, water supply and drainage:-Calculate the needs from which the connection equipment equipped with power supply network, water supply network. Schemes, plans to connect will be the contractor submitted to the owner for review and approval.-Power supply: use the power source to connect from the project are shown in the drawing of the construction measures, using a separate electric meter, layout 1 150KVA generators to ensure the operation of the market when the power is out. -Water supply: use existing water sources of the project, the contractor will conduct connected with the water supply system by the owner to specify and use a separate water meters.
đang được dịch, vui lòng đợi..