Bre17 for guidance of the Department of Transportation about licensing crank railings at this location, and get the answer that: the need to conduct a trial in fence location crank construction and partial repayment status quo fence (fence construction destructive test piles), as if the new stable traffic allowed to crank the railings. By the time until Chinese new year not so much, the crank try fences and returned to take more time to see the opening of the No. 3 line in this is not effective, Bre17 recommendations to change the sequence of execution of 3 drills bored as in the attached documents.
đang được dịch, vui lòng đợi..
![](//viimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)