1. For items not stored in the port, the beachIn this case, the owner of the goods or who are shippers mandated stands out delivery directly to the train-To be able to conduct unloading, 24 hours before the ship to location Navigator, shippers must give port some vouchers:+ A brief goods declaration (2)+ Queuing scheme (2)+ Tunnel details (2)+ Oversized Items, too heavy (if available)-Shippers produce original invoices for its representative to the train-Direct order from the ship and set up the necessary documents in the process of shipping, such as:+ Minutes of the train tunnel inspection (created before unloading) to responsibility for the train on the loss happened after this.+ Minutes of unloading (COR) for loss of tangible+ Letter of protest (LOR) reserve for losses not visibly+ Order with statement (ROROC)+ Report on the inspections+ Lack of goods certificate
đang được dịch, vui lòng đợi..
