European-Jintai design water level with the bottom of the River, flood frequency in level 2, 67m (P = 5%), 2, 36 m (P = 10%) with the maximum water level in the River until finally the Castle door escape the flood 5% and to flood through the spill with Club quo in river level 2, 07m. High-process prevents the river is 4, 3 m. Hydraulic calculation shows designed to drain make sure sweet haircut and high threshold the flood compartment is-1.5 1.0 0.5 m;-;-ensure stop flooding from the river Bottom at the Vac is 3, 08m (P = 2%).According to the calculations of the hydraulic model of system status, flood irrigation like the present (P = 10%), Huanglong bastards stools do not occur. The water level at the bridge, 58 m 2 Rapids are lower than when the flood is 20 cm, at the bridge water level is 2, Yen, lower than the 46 m when the flood is 15 cm. Thus, with regard to the case of build more locks Jintai then draining flood water level also did not change significantly. So, this works only for watering, savory masterpiece season pane and to prevent flooding from the river Bottom into the Cauldron.And from these calculations showed that the construction of Europe Jintai water intrusion into the salty tide Vac but also not make the water level rise are counting the door outside the radio station-three rivers area, construction area of about 450m. All right then, the vicarious effect of works when entered for other areas are considered, the affected as flood switch or increase the area flooded other areas being affected.
đang được dịch, vui lòng đợi..
