2.3 wastewater collection system arises from the box buriedWaste water arising from the activities of CTRSH processing principal project leaks water is rubbish arising from the process of burying, water leak junk in the truck transporting the waste to KLH arise when transport pour CTRSH down the box buried, rainwater flows overflowed on the surface of the region are buried secretly buried box down by not be covered.All the water leaked this garbage are picked up by the water leak tube trash system was installed right in the sand for drainage layer thickness of 1 m, below the layer of waste, which is then pumped about junk to leak water reservoir number 1 and number 2.2.3.1 the system pipe leak water collectors of garbage buried box 1 (completed building, burying the number 1 are receiving spam)Before the construction of the system of pipes, water leak, garbage collectors on the liner bottom (refer to construct burial box is presented in section 9.1), conducted USING VWS pour a thick sand layer 1 m, called LCRS sand layer (sand collecting junk to leak water), in this sand layer is water leak garbage collection system includes many HDPE pipe with different sizes along with a thick layer of ice drainage 1x2cm about 20-40 cm seat above, all are wrapped in a layer of geotextile has fixed effects layers and tubes, and filter components like sand, dirt ... avoid clogging the tube.Pipe leak water collection system of garbage buried box no. 1 was built in a fish bone. Fish bone shaped tube system consisting of many branches and 5-6 larger diameter main line branch line was set to put the tube slope is I = 1.0% stars for water to leak from the branches can pour easily on the main line.
đang được dịch, vui lòng đợi..