In many years of work in the field of mechanical repair, maintenance. I had a lot of experience in the job. I have been tasked to find out the cause of the B3516 model diesel generator. During that time the machine runs about fifteen minutes of being error is high, the cooling water temperature and air regularly being shutdown. I have to work directly with departments and suppliers to find out the cause in two days time. I watched documentaries and brought out the causes. I want to create blueprints and laid out but the question for the error on your machine, and they have been I think smoothly. I have step by step checking the cooling system has been obstructed, check the sensor have been wrong and combustion chamber have leaked or been cracking. I have discovered b. clogged cooling welding ro wholesale welding. I fixed the error that after washing and cooling air welding students. I step by step implementation of the objectives in the given time frame and try to complete them on time. You can tell that some situations is the pressure but I would think that is challenging situations and it requires me to try more to meet it.
đang được dịch, vui lòng đợi..
