- The volume of reference detailed tables attached volume
- Payment according to the actual volume of construction
- Part Construction: 1 Floor payment completed 95% of construction
- Part warrant: 1 floor completed 95% of payments + 5% of warrants remaining volume of construction
- Part tiles and paving: 1 floor bar complete payment volume 95% complete. The next floor is complete 95% of payment volume that floor and 5% volume previously completed floor
- After accepting the handover of projects put into use, the contractor will pay 100% of the settlement (after when deducting the previous installment)