2-6 STATUS OF TRAFFIC AREAS.
Ben Tre Province is characterized by geographically unlike other provinces in the Mekong Delta region, surrounded by river and sea provinces should be able to communicate with the outside by road met a lot harder towel, while exchanges with other countries and regions in the country by river and sea is very convenient. a / road network: roads in Ben Tre was formed 80 years ago, the network announced relatively reasonable position. The main roads of two types. - Highway 60 connecting Highway-1A from Trung Luong junction through the Rach Mieu ferry crossing linking Tra Vinh 3 isles, ending at the ferry terminal Chien. 36km length which 28,8km road asphalt road, the 8m, 12m wide platform. The rest are gravel roads. Ham Luong ferry on a route. - The provincial road running parallel to the line of 4 River waterway: Tien Giang, Ba Lai, Ham Luong and Co Chien. + Provincial Road 883 starting from the junction of Chau Thanh (Tan Thanh - Highway 60) ending in Chengde commune Binh Dai district, 51,7km length, the width 4-5m, 6-7m background, red long paragraph 45,2km gravel, dirt road segment remaining. + Provincial Road 884 from the junction of Tan Thanh through Ben Tre airport area, ending at the confluence of rivers Ham Luong and Tien. Length of 23,8km. Roadbed surface and wide as the provincial road 883, paragraph 17,8km long red gravel, dirt road 6 km long. + Provincial Road 885 from the last town Giong Trom District, Ben Tre, ends at Ham Luong river Ba Tri District . 44,7km length, segment length of 40km of paved road surface, others are red gravel. + Provincial Highway 886 from the intersection of Phu Khuong (Highway 60) to the junction of the mid market. This is the peripheral road of Ben Tre town for transport away from Highway 60 via Giong Trom, not in inner Ba Tri. Length of 9,6km. Front 4-6m wide, 8m background. 5km paved sections, others are red gravel. + 887 Provincial Road linking Ben Tre town to Son Christian (885), 22km long, 4-6m wide face, background 9m. Red gravel sections 6km, 16km long dirt road, not a 4-wheel traffic. + Provincial Road 888 from Long Ho district boundaries Vinh Long province over to Cho Lach District Giao Thoi seaport Thach Phu district. Length of 103km. 4-5m wide pavement, background 6m, long paragraph 15km paved, others are gravel road red. - The network of district roads, communal roads to follow the major axis connecting the communes, the sub-region districts and provinces. b / waterways. waterway transport network of Ben Tre province is a strength that blessed, with 65km of coastline, 4 rivers and small rivers greatly facilitate transport regional and local load. Especially from Cua Dai Tien River to Phnom Penh's international shipping routes. Among them is about 29km inland waterways vessels through again from 1000 to 2000 tons; 500km waterway 300-500 ton ships can pass it back. Over 4000 large and small canals for boats from 10-20T easy access to the hamlet and fields. 2km canals density / km2. C / Street no. In the north west of Ben Tre town had a military airfield was built before 1975. Currently, airports and transport systems in airports is broken and damaged much. If repairs are investing to upgrade the airport to serve the transportation which mainly service key industries, tourism and trade, the economy of Ben Tre will certainly take steps strong changes . d / road traffic Rach Mieu ferry. the ferry Rach Mieu Ho Chi Minh city and 71km from construction companies and mining transport works manager Ben Tre province. Ferry terminal is located in the north bank of My Tho City, Tien Giang Province, the southern bank in Chau Thanh district, Ben Tre province, 14km from the town of Ben Tre. Ferry terminal 4, 6 ferry 100 tons, 40 tons 2 ferries. Operating time of the day on the ferry from 3 am to 22 pm (time period remaining ferries operate only when required). Normally held three ferries run continuously, peak time running 4 ferry. 3.2 km run ferry journey. Time means of transport across the river plain: - For ferry 40 tonnes: 1525 minutes. - For ferry 100 tons: 2535 minutes. Waiting times at ports of density dependence and high time vehicle of the day, an average of about 35-40 minutes: the number of investigations in 1997, an average of 826 cars of all kinds in a day by ferry and car to the peak of 10% of the total number of vehicles day and night. 2-7 tRAFFIC pLAN. a / traffic planning Ben Tre province. To serve the people's movement between regions, urban clusters, for production and circulation of goods, rules traffic planning trends create a closed communication network linkage and ensure traffic in all situations. * road traffic: - north-south axis: Highway 60 reconstruction of grade III standard contract ice. Immediate upgrade Rach Mieu ferry and two Ham Luong ferry with estimated cost of $ 500,000 / 1 terminal. The upgrading of this route lies in the strategy of adding a traffic branch parallel to National Highway 1A region Tien Giang - Ben Tre is a chance for Ben Tre reduce separation on a road with other provinces. - axis East - West: + Provincial Road 884. To upgrade, expand and tangle
đang được dịch, vui lòng đợi..
