2. Provision spin: The machine provides dial backup must be able to rise to the rated power according to the frequency signal or other signals are automatically operated unit power system and electricity market rules in Within twenty-five (25) seconds and maintained at the rated power that minimum thirty (30) minutes.
3. Quick start: The machine provides fast boot backup must be able to rise to the rated capacity within fifteen (15) minutes and maintained at this minimum capacity of eight (08) hours.
4. Cold start: The machine offers a cold boot backup must be able to rise to the rated capacity within eight (08) hours and maintained at this minimum power level one (01) weeks.
5. Voltage Regulation: The machine provider voltage regulators must be able to change the reactive power to meet the requirements of the operating unit power system and electricity market.
6. Provision operator must play to ensure the security of the power system: Unit provides backup service operators must play to ensure the security of the power system must be able to rise to the rated capacity of a (01) time and power level to maintain a minimum of eight (08) hours.
7. Boot Black: Unit startup service provider must have the ability to black boots from cold state without external power and must be able to connect, to power transmission grid after launch be.
đang được dịch, vui lòng đợi..
