Transported by air does not extend to any carriage by land, sea or inland waterways conducted outside the airport. However, if such carriage occurred while executing a contract of carriage by air for the purpose of pickup, delivery or transfer of goods, the damage is considered to be the result of events occurring during operation airlifted
đang được dịch, vui lòng đợi..
